Ducting & Troughing Routes

Specialist ducting and troughing services for routing power, signalling, and telecoms.

Our works are delivered with precision and care, ensuring compliance with Network Rail specifications and minimising disruption to live railway environments. From planning and excavation to installation and reinstatement, we provide complete solutions to protect critical cabling systems and maintain long-term asset integrity.

View Projects
What We Offer
  • Installation of concrete, GRP, and polymer troughing systems
  • Multi-way ducting installation for power and comms cables
  • Under-track duct crossings (UTXs)
  • Under-road duct crossings (URXs)
  • Trench excavation, backfilling, and reinstatement
  • Route setting out and compliance with design specifications
  • Draw pit, chamber, and manhole installations
  • Cable protection and identification systems
  • Trough route levelling, alignment, and anchoring
  • Integration with REBs, LOCs, and signalling equipment
  • Controlled working in proximity to live tracks
  • Asset protection and cable diversion works
  • As-built documentation and record drawings
  • Collaborative planning with telecoms and signalling engineers

Recent Projects

NIROC


Babcock
Belfast

View Project

Kirkcaldy & Bathgate Drainage


Flexspace
Kirkcaldy & Bathgate

View Project

Reliable infrastructure. Proven expertise.

Do you have a project in mind?

Find out more about how Ready Construction can help you deliver your next project, contact us today.

Contact Us

Scotland

Imex Business Centre, Unit 6
Craigleith Road
Stirling
FK7 7WU

t. 01236 722647

England

Offices 18-19, TMS House
Cray Avenue, Orpington
Kent
BR5 3QB

t. 01236 722647

Northern Ireland

137 Moneyreagh Road
Moneyreagh
Newtownards
BT23 6BH

t. 01236 722647

Privacy Preference Center